Spears Schedule 40 PVC Coupling 429

$2.95

Spears | 429-211 | 1-1/2X1 PVC Reducing Coupling Socket Sch40

  • Coupling for connecting two pipes with the same diameter in a straight run
  • Socket openings on both ends for connecting two male pipes
  • PVC for chemical and corrosion resistance, high strength, and less weight than fittings made from metal
  • Maximum operating temperature of 140 degrees F
  • Meets ASTM D1784 and D2466 standards for quality assurance, and certified by NSF International for potable water service

FREE SHIPPING ON ORDERS OVER $50

Description

This Spears 429 series schedule 40 PVC coupling has socket openings on both ends and is suitable for connecting two unthreaded pipes with the same diameter going in the same direction to extend a straight run. The socket ends connect to pipes with a smooth bore for enhanced flow. This coupling is made of white PVC (polyvinyl chloride) for chemical and corrosion resistance, high strength, and less weight than fittings made from metal. It is compatible with schedule 40 PVC pipes and fittings and is suitable for cold-water pressure distribution systems including irrigation, pool and spa, potable water, and chilled water applications. PVC can be connected to other materials such as steel, copper, or cast iron using transition fittings. The fitting has a maximum operating temperature of 140 degrees F, meets ASTM International D1784 and D2466 standards for quality assurance, and is certified by National Sanitation Foundation International (NSF) for potable water service. This schedule 40 PVC coupling is suitable for connecting pipes for conveying drinking water, waste water, chemicals, and other liquids in a range of industries. Pipe fittings are components used for connecting, terminating, controlling flow, and changing the direction of piping in many different industries. When purchasing pipe fittings, consider the application, as this will affect material type, shape, size and required durability. Fittings are available threaded or unthreaded, in many shapes, styles, sizes, and schedules (pipe wall thickness). Spears Manufacturing produces thermoplastic fittings and valves for fluid, drain, waste, and vent systems. The company, founded in 1969 and headquartered in Sylmar, CA, meets International Organisation for Standardisation (ISO) standard 9001.

Reviews

There are no reviews yet.

Be the first to review “Spears Schedule 40 PVC Coupling 429”

Order Processing: After your payment is authorized and verified, we will start processing your order and this process can take from 1 to 2 business days, so please be patient with us. If we are unable to process your order due to inaccurate or incomplete payment or incorrect address information, your order processing may be delayed.

Carrier: UPS/FedEx/USPS. Delivery Timescale: More than 90% of orders arrive in 10 business days after despatch.

FREE RETURNS on all orders!
The following conditions must be met:

1. Items must be returned within 30 days after the purchase date.
2. Items must be unworn, undamaged and in original packaging.

Spears Schedule 40 PVC Coupling 429